Send Message
Home ProductsSolar Water Heater Controller

Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project

Certification
China JIAXING PASSION NEW ENERGY TECHNOLOGY CO., LTD. certification
China JIAXING PASSION NEW ENERGY TECHNOLOGY CO., LTD. certification
Customer Reviews
Good Solar Water Heater, Good team saves my time , Thanks.

—— John Christopher from Spain

Thanks for visting us to solve my project issue.

—— Marco from Egypt

Good quality! High Efficiency! So glad to cooperate with you.

—— Pablo from Argentina

I'm Online Chat Now

Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project

Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project
Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project

Large Image :  Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project

Product Details:
Place of Origin: CHINA
Brand Name: PASSION/OEM
Certification: CE
Model Number: PT-SP
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: Negotiable
Packaging Details: CARTONS/PLYWOOD CASE/PALLET
Delivery Time: 7 working days
Payment Terms: L/C, T/T
Supply Ability: 10000units/month

Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project

Description
Rated Voltage: 220V/110V Application: Solar Pump Station
Model: PT-SP Pump: WILO
Using: Centralized Solar Water Heating System Colour: Silver
Pipe: Copper Accessories: Controller And Pump
High Light:

solar hot water controller

,

solar thermal controller

 

Intelligent Controller for Centralized Hotel Resort Solar Water Heating Project

 

 

Main Functions:

1, Time display
2, Water temperature display
3, Water level display
4, Auto mode
5, Water level pre-setup
6, Manual water loading
7, Temperature controlled water loading
8, Timing water loading
9, Water loading when tank is lack of water
10, Compulsive water loading
11, Increasing Water pressure during water is loaded.
12, Manual heating
13, Timing heating
14, Hot water circulation
15, Hot water pipe insulation
16, Low pressure protection
17, Collector tube protection
18, Memory protection when power is failure


 
CENTRALIZED SOLAR WATER HEATING SYSTEM USER MANUAL

 

PART ONE

 

A. Water shortage protection.

If the ‘actual water level’ is less than(<) the ‘start the protection at water level’ ,

the centralized solar water heating system start the ‘water shortage protection’, all the related water pump,auxiliary heating stop the working.

 

If the ‘actual water level’ is greater than or equal to (≥) the ‘stop the protection of water level’ ,

the centralized solar water heating system stop the ‘water shortage protection’, all the related water pump,auxiliary heating restart the working.

 

B. Heat exchange(the circulation between the water tank and solar collector).

When the ‘temperature in difference ’ between the water tank and and the solar collector

is greater than or equal to (≥) the ‘start the circulation at’ , the circulation start the working.

 

When the ‘temperature in difference ’ between the water tank and and the solar collector

is less than or equal to (≤) the ‘stop the circulation at’ , the circulation stop the working.

 

Note:

When the ‘actual tank temperature’ is greater or equal to (≥) the setting value ‘Highest temp of water tank’,

the circulation pump will be forced to stop the working.

In case that the actual tank temperature will be too much higher.

 

C. Anti-freezing of collector pipeline

When the temperature in the collector pipeline is less than(<) the temp of ‘Start the pipeline circulation at’,

the circulation pump will be forced switch on for some time (It depends on the setting of ‘working time’).

 

Then it stop by 3 minutes, and detect the temperature in the collector pipeline for several times,

until the temperature in the collector pipeline is more than(>) the setting temperature.

 

D. Circulation of terminal water pipeline(between the water tank and terminal water using).

When the temperature of terminal pipeline is less than or equal to(≤) the setting temp ‘start the circulation at’,

it start the circulation.

 

When the temperature of terminal pipeline is greater than (>) the setting temp ‘stop the circulation at’,

it stop the circulation.

 

E. Anti-freezing of terminal water pipeline(between the water tank and terminal water using).

When the temperature of terminal pipeline is less than or equal to(≤) the setting temp ‘start the circulation at’,

it will be forced start the circulation for 5 minutes.

It can prevent the pipeline from frost crack.

 

F. Auxiliary heating.

When the water tank temperature is less than(<) the temp of ‘start the electric heating at’,

the electrical element start the working.

 

When the water tank temperature is more than(>) the temp of ‘start the electric heating at’,

the electrical element stop the working.

 

G. Automatically water supply.

When the ‘water level’ is less than or equal to(≤) the minimum water level ‘start the water supply at level’,

it start the water supply.

 

When the ‘water level’ is greater than (>) the maximum water level

‘stop the water supply at level’, it stop the water supply.

 

H. Reset.

Press the ’reset’ to restore the original factory system defaults.

 

Applications


1) Hotels, resorts, hospitals and hostels
2) Process industry, boiler feed, laundry and canteens
3) Agricultural sector, hatcheries and dairies
4) Process industry, Boiler feed, Laundry and canteens
5) Agricultural sector, hatcheries, and dairies
6) Swimming pool heating
7) In-process heating
8) Health clubs (Steam / Sauna)

 

Specifications

 

Modle PT-NC-15 PT-NC-20 PT-NC-25 PT-NC-30 PT-NC-40 PT-NC-50 PT-NC-60
Quantity of Tubes 15 20 25 30 40 50 60
Contour aperture area 1.94m2 2.58m2 3.22m2 3.88m2 5.16m2 6.44m2 7.76m2
Manifold Inner shell: 304 2B Foaming: High pressure polyurethane
Three Target Vacuum Tube Diameter/Length: φ58mm/1800mm; High boron and silicon content 3.3; Structure:Gradual change SS-AL-Nx/Cu selective absorption coating; Vacuum Degree:P<=5*10-3;
Anti-dust Ring White Silicon Rubber
Work Pressure 0.05Mpa
Bracket Galvanized Steel with Plastic Coating in Black color - 0/20/30/45 degrees
Tailstock ABS
OEM Service Logo painting on products and package is for free (20FT,40FT,40HQ)

 

Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project 0Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project 1Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project 2

 

 

Contact Details
JIAXING PASSION NEW ENERGY TECHNOLOGY CO., LTD.

Contact Person: Mr. Terry White

Tel: +86 135 1138 8384

Send your inquiry directly to us (0 / 3000)