JIAXING PASSION NEW ENERGY TECHNOLOGY CO., LTD.

Solar Water Heater, Solar Collector, Flat Panel manufacturer

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Company News
Home ProductsSolar Water Heater Controller

Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project

Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project

    • Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project
    • Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project
    • Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project
    • Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project
  • Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project

    Product Details:

    Place of Origin: CHINA
    Brand Name: PASSION/OEM
    Certification: CE
    Model Number: PT-SP

    Payment & Shipping Terms:

    Minimum Order Quantity: 1
    Price: Negotiable
    Packaging Details: CARTONS/PLYWOOD CASE/PALLET
    Delivery Time: 7 working days
    Payment Terms: L/C, T/T
    Supply Ability: 10000units/month
    Contact Now
    Detailed Product Description
    Rated Voltage: 220V/110V Application: Solar Pump Station
    Model: PT-SP Pump: WILO
    Using: Centralized Solar Water Heating System Colour: Silver
    Pipe: Copper Accessories: Controller And Pump
    High Light:

    solar hot water controller

    ,

    solar thermal controller

     

    Intelligent Controller for Centralized Hotel Resort Solar Water Heating Project

     

     

    Main Functions:

    1, Time display
    2, Water temperature display
    3, Water level display
    4, Auto mode
    5, Water level pre-setup
    6, Manual water loading
    7, Temperature controlled water loading
    8, Timing water loading
    9, Water loading when tank is lack of water
    10, Compulsive water loading
    11, Increasing Water pressure during water is loaded.
    12, Manual heating
    13, Timing heating
    14, Hot water circulation
    15, Hot water pipe insulation
    16, Low pressure protection
    17, Collector tube protection
    18, Memory protection when power is failure


     
    CENTRALIZED SOLAR WATER HEATING SYSTEM USER MANUAL

     

    PART ONE

     

    A. Water shortage protection.

    If the ‘actual water level’ is less than(<) the ‘start the protection at water level’ ,

    the centralized solar water heating system start the ‘water shortage protection’, all the related water pump,auxiliary heating stop the working.

     

    If the ‘actual water level’ is greater than or equal to (≥) the ‘stop the protection of water level’ ,

    the centralized solar water heating system stop the ‘water shortage protection’, all the related water pump,auxiliary heating restart the working.

     

    B. Heat exchange(the circulation between the water tank and solar collector).

    When the ‘temperature in difference ’ between the water tank and and the solar collector

    is greater than or equal to (≥) the ‘start the circulation at’ , the circulation start the working.

     

    When the ‘temperature in difference ’ between the water tank and and the solar collector

    is less than or equal to (≤) the ‘stop the circulation at’ , the circulation stop the working.

     

    Note:

    When the ‘actual tank temperature’ is greater or equal to (≥) the setting value ‘Highest temp of water tank’,

    the circulation pump will be forced to stop the working.

    In case that the actual tank temperature will be too much higher.

     

    C. Anti-freezing of collector pipeline

    When the temperature in the collector pipeline is less than(<) the temp of ‘Start the pipeline circulation at’,

    the circulation pump will be forced switch on for some time (It depends on the setting of ‘working time’).

     

    Then it stop by 3 minutes, and detect the temperature in the collector pipeline for several times,

    until the temperature in the collector pipeline is more than(>) the setting temperature.

     

    D. Circulation of terminal water pipeline(between the water tank and terminal water using).

    When the temperature of terminal pipeline is less than or equal to(≤) the setting temp ‘start the circulation at’,

    it start the circulation.

     

    When the temperature of terminal pipeline is greater than (>) the setting temp ‘stop the circulation at’,

    it stop the circulation.

     

    E. Anti-freezing of terminal water pipeline(between the water tank and terminal water using).

    When the temperature of terminal pipeline is less than or equal to(≤) the setting temp ‘start the circulation at’,

    it will be forced start the circulation for 5 minutes.

    It can prevent the pipeline from frost crack.

     

    F. Auxiliary heating.

    When the water tank temperature is less than(<) the temp of ‘start the electric heating at’,

    the electrical element start the working.

     

    When the water tank temperature is more than(>) the temp of ‘start the electric heating at’,

    the electrical element stop the working.

     

    G. Automatically water supply.

    When the ‘water level’ is less than or equal to(≤) the minimum water level ‘start the water supply at level’,

    it start the water supply.

     

    When the ‘water level’ is greater than (>) the maximum water level

    ‘stop the water supply at level’, it stop the water supply.

     

    H. Reset.

    Press the ’reset’ to restore the original factory system defaults.

     

    Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project 0Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project 1Intelligent Controller For Centralized Hotel Resort Solar Water Heating Project 2

     

     

    Contact Details
    JIAXING PASSION NEW ENERGY TECHNOLOGY CO., LTD.

    Contact Person: Passionsolar

    Send your inquiry directly to us
    Other Products